Project Description
The existing deteriorated timber walkway along the shoreline was dismantled and removed. The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained. A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.
Basics
Calhoun
City of Port Lavaca
7
Classification
CMP
- 306A
Waterfront Revitalization & Ecotourism Development
Contacts
Timeline
Closed
2004
Budget/Costs
$100,000.00