Bayfront Peninsula Restoration Project

Project Description

The existing deteriorated timber walkway along the shoreline was dismantled and removed. The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained. A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.

Basics

Calhoun
City of Port Lavaca
7

Classification

CMP
  • 306A
Waterfront Revitalization & Ecotourism Development

Contacts

City of Port Lavaca
Ken Lester

Timeline

Closed
2004

Budget/Costs

$100,000.00