Baytown Nature Center - Crystal Bay Shoreline Stabilization

Project Description

The City of Baytown constructed a 500' concrete riprap breakwater that connects to the existing breakwater on Burnet Bay to help control the ongoing erosion along the Crystal Bay shoreline.

Basics

Harris
City of Baytown
13

Classification

CMP
  • 306A
Critical Areas Enhancement

Contacts

City of Baytown
Scott Johnson

Timeline

Closed
2010

Budget/Costs

$165,750.00