Project Description
The City of Baytown constructed a 500' concrete riprap breakwater that connects to the existing breakwater on Burnet Bay to help control the ongoing erosion along the Crystal Bay shoreline.
Basics
Harris
City of Baytown
13
Classification
CMP
- 306A
Critical Areas Enhancement
Contacts
Timeline
Closed
2010
Budget/Costs
$165,750.00