Project Description
The Town of Fulton replaced severely deteriorated galvanized metal brackets, bracing, and light standards along both sides of approximately 600 linear feet and repaired the bracing and roof of the T-head pavilion.
Basics
Aransas
Town of Fulton
10
Classification
CMP
- 306A
Shoreline Access
Contacts
Timeline
Closed
2007
Budget/Costs
$100,000.00