Project Description
This project conducted beach nourishment activities within a 600-foot construction width along 12-miles of shoreline in North Cameron County. The 600-foot construction width will include a 300-foot berm crest and a 300-foot slope to the toe of fill to match the existing permitted dimensions of beach nourishment templates to the south of Andy Bowie Park. This Project is Phase 1 of 2 which includes design and USACE permitting of the beach nourishment. Phase 2 will include coordination with the Army Corps of Engineers to include the proposed nourishment of 12-miles of shoreline in their future maintenance dredging plans for the Brazos Santiago Pass or from dredging of other adjacent borrow locations.
Basics
Cameron
Cameron County
11
Classification
CEPRA
- Beach Nourishment with BUDM
Contacts
Timeline
Active