Project Description
The design, manufacture, shipping, installation, and start-up of two (2) Mobile Bilge Pumpout Stations are located at Rockport-Fulton and Port Aransas Harbors. The mobile units are located indefinitely at the two locations. Each unit consist of a skid-mounted tank and pump designed to pump-out and hold up to 3000 gallons of contaminated bilge water. The GLO disposed of the contaminated water as part of their existing bilge pumpout and cleanup activities.
Basics
Aransas
Texas A&M University - Corpus Christi
7
Classification
CMP
- 6217
Water Quality Improvement
Contacts
Timeline
Closed
2003
Budget/Costs
$66,000.00