Project Description
This project is a first phase feasibility study and coastal engineering analysis to evaluate existing conditions and hydrodynamic processes for the project site and characterize design parameters, develop alternatives to meet the project goals, and determine the preferred alternative for the project goals.
Basics
Calhoun
Port Lavaca
City of Port Lavaca
13
Classification
CEPRA
- Beach Nourishment
- Marsh/Wetland Restoration or Protection
Contacts
Timeline
In Progress