San Luis Pass Inlet Management Study

Project Description

The goal of the project was to conduct an environmental assessment and obtain a USACE permit for the use sediment from the San Luis Pass flood delta, which has been lost from the littoral system, to nourish beaches, reestablish dunes and restore other natural resources such as wetlands. Management of the sand resources in the San Luis flood delta will be of great value to adjacent shorelines by reducing erosion and can be used as a renewable source. While locations for potential sand borrow sites have been preliminarily identified, an environmental assessment of the proposed dredging project will need to be undertaken to determine if any adverse environmental impacts will occur.

Basics

Galveston
Brazoria County
5

Classification

CEPRA
  • Study/Research Project

Contacts

Timeline

Completed
2013

Budget/Costs

$0.00
$0.00
$0.00
$0.00
$0.00