County/Region:
Chambers
Project Partner/Recipient:
Trinity Bay Conservation District
Summary:
The Trinity Bay Conservation District constructed and developed a surface flow constructed wetland to properly treat the wastewater within the community. The wetland is being designed to handle an anticipated flow of 100,000 gallons per day.
County/Region:
Project Partner/Recipient:
General Land Office
Summary:
County/Region:
Project Partner/Recipient:
City of South Padre Island
Summary:
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island will construct a permanent restroom and install an ADA compliant ramp for the ingress and egress of the walkover.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island created dunes, transplanted and vegetated the newly created dunes, and watered the vegetation once it was transplanted.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
This project widened the City of South Padre Island's beach using dredge material.
County/Region:
Cameron
Project Partner/Recipient:
South Padre Island Birding and Nature Center
Summary:
South Padre Island Birding and Nature Center constructed 1,538 linear feet of a new 6-foot-wide boardwalk to be connected with the existing boardwalk that extends from the convention center.
County/Region:
Cameron
Project Partner/Recipient:
South Padre Island Birding and Nature Center
Summary:
South Padre Island Birding and Nature Center installed 23 interpretative signs on the boardwalk extending from the Center to the Laguna Madre and connecting to the existing boardwalk at the South Padre Island Convention and Tourism Center.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
This beach nourishment project used dredged material from the Brownsville Ship Channel.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
This beach nourishment project beneficially used dredged material from the Brownsville Ship Channel.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The South Padre Island dune restoration project addressed the need to provide safer public access from coastal hazards presented along the gulf Coast.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
This project restored approximately 2 miles of dune with 20 feet of vegetation planting at the tow of the dunes seaward all of which will occur in one-mile tracs annually.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island continued to restore low lying areas and gaps in the dune line along the entire length of the City’s beach in an effort to form a continuous dune line that is 12 feet above sea level and 125 feet wide.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island implemented dune restoration projects along the entire length of the City's beach at identified low lying areas and gaps in dune line by staging and hosting volunteer planting events.
County/Region:
Cameron
Project Partner/Recipient:
City of South Padre Island
Summary:
The City of South Padre Island began the development of a City of South Padre Island Erosion Response Plan to be attached as an Amendment to the existing Beach Access and Dune Protection Plan.
County/Region:
Cameron
Project Partner/Recipient:
Texas General Land Office
Summary:
This project consisted of dune restoration in numerous areas of the county beach and beach nourishment for approximately 2,000 feet of South Padre’s heavily used beach, completed in April 2001.
County/Region:
Cameron
Project Partner/Recipient:
Texas General Land Office
Summary:
This project nourished 2,000 feet of Gulf-facing beach along South Padre Island.
County/Region:
Willacy
Project Partner/Recipient:
General Land Office
Summary:
The Town of South Padre Island completed the first phase of a multi-phase sand source investigation that involved the review of existing data and recommendations to focus future data collection and engineering evaluation phases.
County/Region:
Cameron
Project Partner/Recipient:
Texas General Land Office
Summary:
This beach nourishment project at South Padre Island utilized beach quality sand dredged from the Brazos-Santiago Pass by the U.S. Army Corps of Engineers in December 2000.
County/Region:
Cameron
Project Partner/Recipient:
Texas General Land Office
Summary: