Summary
The existing deteriorated timber walkway along the shoreline was dismantled and removed. The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained. A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.
Basics
Calhoun
N/A
City of Port Lavaca Port Commission
$100,000
Classification
- CMP 306A
Waterfront Revitalization & Ecotourism Development
Timeline
completed
Funding Sources
Source 1
03-024
Coastal Management Program (CMP)
Primary
Federal
$60,000
07
Source 2
03-024
City of Port Lavaca Port Commission
Secondary
City
$40,000
07
Contacts
Responsibility
General Land Office
Contact
Responsibility
City of Port Lavaca Port Commission
Contact
Mr. Ken Lester
Chairman of Port Commission
P.O. Box 105
Port Lavaca, Texas 77979
361.552.9794
361.552.6062
Email