Summary
The existing deteriorated timber walkway along the shoreline was dismantled and removed. The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained. A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.
Basics
Calhoun
N/A
City of Port Lavaca Port Commission
$100,000
Classification
- CMP 306A
Waterfront Revitalization & Ecotourism Development
Timeline
Funding Sources
Source 1
03-024
Coastal Management Program (CMP)
Primary
Federal
$60,000
07
Source 2
03-024
City of Port Lavaca Port Commission
Secondary
City
$40,000
07
Contacts
General Land Office
City of Port Lavaca Port Commission
Mr. Ken Lester
Chairman of Port Commission
P.O. Box 105
Port Lavaca, Texas 77979
361.552.9794
361.552.6062
Email