Enhancing Water Quality and Dredged Material for the Port of Harlingen (Phase I)

Summary

This project is the first phase of a larger effort to ultimately construct a two-bank wetland system at the Port of Harlingen. The larger effort would expand this initial project to both banks of the turning basin at the Port, which would lead to even greater water quality and habitat improvements. Due to the time required to obtain permits and construct a wetland, we are proposing to conduct preliminary assessments, develop a conceptual design for the site, and begin the permitting process. This necessary first phase includes an ecological site assessment and inventory; a wetland site suitability evaluation; hardscape and landscape design; and permit(s) inquisition.

Basics

Cameron
N/A
Texas AgriLife Research
$134,179

Classification

  • CMP 306
Water Quality Improvement

Timeline

completed

Funding Sources

Source 1

10-046
Coastal Management Program (CMP)
Primary
Federal
$80,276
14

Source 2

10-046
Texas AgriLife Research
Secondary
State
$53,903
14

Source 3

10-046
Third Party
Other
Other
$25,000
14

Contacts

Responsibility
Texas A&M University
Contact
Dr. Bill Harris TAMU 21 College Station, Texas 77979 979-845-1851
Responsibility
General Land Office
Contact
Coastal Resources 800.998.4456 512.475.0773