Summary
A 6-foot wide concrete cap was installed to seal the existing steel sheet pile bulkhead, and 350 linear feet of 6-foot wide concrete walkway was constructed atop the length of the targeted east wall bulkhead. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway. The degree of slope from existing ground level to walkway will ensure handicap accessibility is maintained. A galvanized handrail was installed at water's edge along the walkway to ensure pedestrian and angler safety.Basics
Calhoun
N/A
City of Port Lavaca Port Commission
$132,572
Classification
- CMP 306A
Waterfront Revitalization & Ecotourism Development
Timeline
Funding Sources
Source 1
04-036
Coastal Management Program (CMP)
Primary
Federal
$79,543
08
Source 2
04-036
City of Port Lavaca Port Commission
Secondary
City
$53,029
08
Contacts
General Land Office
City of Port Lavaca Port Commission
Mr. Ken Lester
Chairman
3667 State Hwy 35 South
Port Lavaca, Texas 77979
361.552.3024
361.552.6062
Email