Summary
A BMMP maintenance renourishment of the western-most 900 linear feet of the pedestrian beach adjacent to Beach Dr. at the Village of Surfside Beach. This maintenance renourishment work, completed in March 2015, facilitated emergency repairs to the western section and terminus of the existing rock revetment adjacent to the pedestrian beach. The present scope of this project concerns U.S. Army Corps of Engineers permit regulatory work for a proposed pair of groin structures at the pedestrian beach.
Basics
Brazoria
N/A
Village of Surfside
$1,700,000
Classification
- CEPRA
Beach Nourishment
Shoreline Protection
Timeline
completed
2018
Funding Sources
Source 1
1570
Coastal Erosion Planning and Response Act (CEPRA)
Primary
State
$1,700,000
07
2014
Contacts
Responsibility
General Land Office
Contact