Summary
This project, along with Project #1511, was part of an emergency erosion response strategy to address the critical erosion of the gulf-facing shoreline adjacent to Beach Drive at the Village of Surfside. The project entailed the use of FEMA Public Assistance funds coupled with CEPRA funds to repair damages from Hurricane Ike to the revetment adjacent to Beach Drive at the Village of Surfside Beach, which was originally completed in August 2008 in CEPRA Cycle 5. IN addition to addressing Ike damage repairs the project enhanced the revetment structure beyond the pre-Ike design. The project was completed in March 2011.
Basics
Brazoria
N/A
Villiage of Surfside Beach
$1,762,914
Classification
- CEPRA
Shoreline Protection
Timeline
completed
2011
Funding Sources
Source 1
1471
Coastal Erosion Planning and Response Act (CEPRA)
Primary
State
$176,292
06
Source 2
1471
Federal Emergency Management Agency (FEMA)
Primary
Federal
$1,586,622
06
Related Projects
Contacts
Responsibility
General Land Office
Contact