Surfside Revetment Emergency Repair

Project Description

This was an emergency repair to the western-most 950 feet of the 3,500 linear-foot rock revetment along the seaward right-of-way of Beach Drive due to damage from ongoing beach erosion.

Basics

Brazoria
Village of Surfside
7

Classification

CEPRA
Beach Nourishment
14-194-000-8239
1573

Timeline

Completed
2015

Contacts

Budget/Costs

$721298.00
$0.00
$721298.00
$0.00
$0.00