Surfside Beach Revetment Project

Summary

This project involved the final design and construction of a shoreline stabilization project along the Gulf shoreline at the Village of Surfside Beach, and was partially funded with FEMA Public Assistance funds. Approximately 3,500 feet of rock revetment was installed along the seaward side of Beach Dr. The revetment was designed to provide protection from a two-year storm, yet withstood the estimated 30-year storm impact of Hurricane Ike, protecting Beach Drive, infrastructure, and houses on the landward side of Beach Drive.

Basics

Brazoria
N/A
Villiage of Surfside
$2,115,318

Classification

  • CEPRA
  • Federal
Shoreline Protection

Timeline

completed

Funding Sources

Source 1

1379
Coastal Erosion Planning and Response Act (CEPRA)
Primary
State
$1,983,892
05

Source 2

1379
Federal Emergency Management Agency (FEMA)
Other
Federal
$876,000
05

Contacts

Responsibility
General Land Office
Contact
Coastal Resources 512.475.0773