Summary
The Town of Fulton increased the height of the erosion control along the 700 linear foot concrete seawall by two feet by utilizing the following construction techniques. A concrete walkway was constructed on top of the existing seawall and extend landward a distance of five feet onto the existing or filled sand. A 1.5 foot high retaining wall with a two foot wide "cap" was constructed on the walkway, and will provide a place for individuals to sit and enjoy the beauty of nature as they look out over the bay. Any wave action that overlaps the new wall will be captured and routed back to the drain inlets behind the wall and carried in underground drains back to the bay.Basics
Aransas
N/A
Aransas County Navigation District
$100,000
Classification
- CMP 306A
Waterfront Revitalization & Ecotourism Development
Timeline
completed
Funding Sources
Source 1
04-164
Coastal Management Program (CMP)
Primary
Federal
$60,000
07
Source 2
04-164
Aransas County Navigation District
Secondary
State
$40,000
07
Contacts
Responsibility
General Land Office
Contact
Responsibility
Aransas County Navigation District
Contact
Mr. Ron Roe
Harbor Superintendent
911 Navigation Circle
Rockport, Texas 78382
361.729.5533
361.729.7029
Email