CR257 Road Repair and Protective Revetment

Summary

Due ot the effects of Hurricane Ike, severe erosion has washed out, or otherwise severely damaged, numerous section of County Road 257, which runs along Follets Island from Treasure Island to the Village of Surfside Beach. Preliminary engineering work will be conducted to identify alternatives to stabilize segments of critically eroding Gulf shoreline along Follets Island immediately adjacent to the road right-of-way and to protect the road, which also serves as a hurricane evacuation route.  The project will include a condition assessment, data collection, and preliminary design of a combination shoreline protection project and temporary road. See also 1382

Basics

Brazoria
N/A
Brazoria County
$27,346,000

Classification

  • CEPRA
Public Access Shoreline Protection

Timeline

completed
2012

Funding Sources

Source 1

1382 Z
Federal Highway Administration (FHWA)
Primary
Federal
$21,262,000
05
2010

Source 2

1382 Z
Department of Emergency Management (DEM)
Secondary
State
$6,084,000
05
2010

Contacts

Responsibility
General Land Office
Contact
Coastal Resources 512.475.0773 800.998.4456