Summary
The Texas Parks & Wildlife Department will replace 1600 linear feet of corroded and failing seawall sheet pilings and concrete cap along the shoreline of Buffalo Bayou (known as the Houston Ship Channel). To reinforce the Levee, it will be rebuilt with additional cross-section reinforced core materials of compacted impervious materials with new levee overtopping materials, additional breadth and height to +15' elev. above mean high tide along the channel frontage. A 10 ft. wide all weather granite gravel walkway will be installed along the entire length of the levee to terminate at the Battleship Texas gangway entrance leading to the San Jacinto Battleground.
Basics
Harris
N/A
Texas Parks and Wildlife Department
$2,600,000
Classification
- CIAP
Public Access
Shoreline Protection
Timeline
completed
2017
Funding Sources
Source 1
200708
Coastal Impact Assistance Program (CIAP)
Primary
Federal
$2,600,000
2007
2012
Contacts
Responsibility
General Land Office
Contact
Responsibility
Texas Parks and Wildlife Department
Contact
Mr. Neil Thomas
Project Manager, Region II
4200 Smith School Road
Austin, Texas 78744
512.389.4355
512.389.4757
Email
Responsibility
General Land Office
Contact