Boggy Bayou Nature Park Shoreline Protection and Restoration-Phase 2

Summary

The feasibility study under Phase 1 is ongoing and will soon be completed. This Phase 2 will include all the necessary bid package components such as design optimization, preliminary design, final design, cost estimates, bathymetric surveys, coastal boundary survey, geotechnical investigation, cultural resources and environmental permitting. An USACE Section 10/404 permit will be necessary. Depending on the selection of the preferred alternative, there will be sand-fill in jurisdictional waters; however, no issues are anticipated in the permitting process. The feasibility study under Phase 1 is ongoing and will soon be completed. This Phase 2 will include all the necessary bid package components such as design optimization, preliminary design, final design, cost estimates, bathymetric surveys, coastal boundary survey, geotechnical investigation, cultural resources and environmental permitting. An USACE Section 10/404 permit will be necessary. Depending on the selection of the preferred alternative, there will be sand-fill in jurisdictional waters; however, no issues are anticipated in the permitting process. A preliminary timeline for Phase 2 includes the development of the bid package during 2022 and 2023, followed by construction beginning in late 2023 under Phase 3.

Basics

Calhoun
N/A
Calhoun County
$664,793

Classification

  • CEPRA
Shoreline Protection

Timeline

completed

Funding Sources

Source 1

1730
Coastal Erosion Planning and Response Act (CEPRA)
Primary
State
$398,875
12
2022

Source 2

Calhoun County
Primary
County
$265,917

Related Projects

Contacts

Responsibility
General Land Office
Contact
Coastal Resources 800.998.4456 512.475.0773