Assessment and Remediation of Abandoned Oilfield Pits in Kleberg County

Summary

The Railroad Commission of Texas (RRC)conducted a feasibility study and determined that the most effective pit closure alternative would be to construct a clay cap supported by a geogrid to cover the pit waste. In situ capping involves the placement of relatively impermeable cap over the contaminated soils and materials. The impermeable cap prevents the vertical infiltration of water into pit contents that would create contaminated leachate and creates a land surface that can support vegetation and be used for certain other purposes. In support of this alternative, RRC verified that the project area was not located in a floodplain by performing a topographic survey.

Basics

Kleberg
N/A
Railroad Commission of Texas
$599,384

Classification

  • CIAP
Coastal Natural Hazards Response

Timeline

completed
2013

Funding Sources

Source 1

Coastal Impact Assistance Program (CIAP)
Primary
Federal
$599,384
2009
2013

Contacts

Responsibility
Railroad Commission of Texas
Contact
Mr. Byron Ellington Operations Manager 1701 N. Congress Austin, Texas 78701 512.463.5983 512.424.7160 Email