Bayfront Peninsula Restoration Project

Summary

The existing deteriorated timber walkway along the shoreline was dismantled and removed.  The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed.  The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained.  A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.

 

Basics

Calhoun
N/A
City of Port Lavaca Port Commission
$100,000

Classification

  • CMP 306A
Waterfront Revitalization & Ecotourism Development

Timeline

completed

Funding Sources

Source 1

03-024
Coastal Management Program (CMP)
Primary
Federal
$60,000
07

Source 2

03-024
City of Port Lavaca Port Commission
Secondary
City
$40,000
07

Contacts

Responsibility
General Land Office
Contact
Coastal Resources 800.998.4456 512.475.0773
Responsibility
City of Port Lavaca Port Commission
Contact
Mr. Ken Lester Chairman of Port Commission P.O. Box 105 Port Lavaca, Texas 77979 361.552.9794 361.552.6062 Email