Summary
A 6-foot wide concrete cap was installed to seal the existing steel sheet pile bulkhead, and 350 linear feet of 6-foot wide concrete walkway was constructed atop the length of the targeted east wall bulkhead. The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway. The degree of slope from existing ground level to walkway will ensure handicap accessibility is maintained. A galvanized handrail was installed at water's edge along the walkway to ensure pedestrian and angler safety.Basics
Calhoun
N/A
City of Port Lavaca Port Commission
$132,572
Classification
- CMP 306A
Waterfront Revitalization & Ecotourism Development
Timeline
completed
Funding Sources
Source 1
04-036
Coastal Management Program (CMP)
Primary
Federal
$79,543
08
Source 2
04-036
City of Port Lavaca Port Commission
Secondary
City
$53,029
08
Contacts
Responsibility
General Land Office
Contact
Responsibility
City of Port Lavaca Port Commission
Contact
Mr. Ken Lester
Chairman
3667 State Hwy 35 South
Port Lavaca, Texas 77979
361.552.3024
361.552.6062
Email