Summary
The City of Port Isabel will create a waterfront park along the Laguna Madre Bay that will promote public access and ecotourism. A Living Shoreline that will include placement of a small near-shore low crested breakwater and construction of a planting area for low marsh vegetation. The objectives of the park design will be to promote ecotourism, provide walk-up handicapped-accessible, access to the Laguna Madre coastal habitats, and provide public education about the benefits of Living Shorelines. An added project benefit will be the stabilization of the existing shoreline through low impact methods (rather than bulkheads). Located in a residential area within the City of Port Isabel, the project will be constructed along approximately 2,000 feet of the Laguna Madre shoreline.Basics
Cameron
N/A
City of Port Isabel
$724,523
Classification
- CMP 306A
Public Access
Public Education & Outreach
Shoreline Protection
Waterfront Revitalization & Ecotourism Development
Wetlands/Marsh/Habitat Restoration
Timeline
completed
2015
Funding Sources
Source 1
13-044
Coastal Management Program (CMP)
Primary
Federal
$219,715
17
2013
Source 2
13-044
City of Port Isabel
Secondary
City
$504,808
- Document13-044-final-rpt.pdf (18.57 MB)
Related Projects
Contacts
Responsibility
City of Port Isabel
Contact
Mr. Edward Meza
City Manager
305 E. Maxan Street
Port Isabel, Texas 78578
956.943.2682 ext. 0706
956.943.2029
Email